- If your checklist is scheduled as a Project, Task, or Schedule, the Location field from the Task Form will pre-populate the Location field in the Checklist Submission.
- However, if your checklist submission is being conducted on an adhoc basis, you can choose to make this location response required
- Follow along with this video guide below to see how!
Add Location Step & Toggle ON Submission Location
- If your template is missing a Location step/field, please add it to the checklist and toggle "Submission Location" on. This way, Xenia knows what Location to tag your Checklist/Form Submissions to in the Reporting module.
Comments
0 comments
Please sign in to leave a comment.